Our crews fixed reinforcement through the build, working to the engineer’s drawings and to the site’s pour program. Steel was fixed, checked and ready ahead of each pour so formwork and concrete crews were never held up, with consistent crews held on site through the structure and regular contact with site management to keep labour matched to the schedule.